Data Center Opportunity

Co-located digital infrastructure powered by geothermal energy

The Olene Gap site offers the potential to integrate phased data-center development with reliable 24/7 geothermal generation.

Why Olene Gap

Power, land and development flexibility

The approximately 150-acre industrial-zoned site provides space for geothermal power facilities, electrical systems and a potential data-center campus. The concept is to develop digital infrastructure in phases that correspond with available generation, customer requirements and project financing.

Final capacity, redundancy, cooling, building configuration and electrical architecture would be developed with qualified data-center operators, developers, engineers and customers.

Conceptual data center server infrastructureConceptual data-center image
Strategic Advantages

Designed around continuous renewable power

24/7 Renewable Energy

Geothermal generation is capable of continuous operation and can complement critical digital-infrastructure loads.

Behind-the-Meter Potential

Co-location can enable direct integration of generation and data-center electrical infrastructure, subject to final design and regulatory requirements.

Phased Capacity

Data-center infrastructure can be sized and expanded to track generation capacity and contracted demand.

Industrial Site

The site provides room for generation, electrical infrastructure, data-center buildings and future expansion.

Commercial Development

Seeking experienced data-center participation

OM Power 1 is seeking direct engagement with organizations that can contribute data-center development expertise, technical design, customer or tenant relationships, capital and execution capability.

Potential structures can be evaluated with qualified counterparties based on each party's proposed capital contribution, development responsibility, risk allocation and commercial role.

Areas for partner discussion

  • Data-center technical development and design
  • Customer / tenant acquisition
  • Capital contribution and capital raising
  • Construction and project execution
  • Ownership, operating and commercial structure
Development Principle

Power project and data center should advance in parallel

Technical and commercial decisions for the data center should remain aligned with geothermal wellfield development, generation phasing, critical-load requirements, backup systems and site infrastructure.

Qualified counterparties

Detailed site, power and technical information can be shared as discussions progress and appropriate confidentiality arrangements are in place.

Data Center Development Opportunity

OM Power 1 welcomes direct discussions with developers, operators, customers and strategic capital partners.

Start a Discussion →