 30 Welding(1).jpg)
Once completed, this geothermal well at Olene Gap will go far down into the subsurface and will either be used to withdraw hot geothermal brine to power a binary turbine system for the production of electricity, or it will be used to re-inject the brine back into the ground from other wells in the vicinity after leaving the power plant.
.jpg) After the wells have been drilled and the plant has been constructed, the terrain will be restored to its natural state, with only a small footprint left to the naked eye.
|